November 20, 2026

BENGALURU EXPRESS

Truth Triumphs

Bengaluru East City Corporation

Spread the love

Bengaluru: April 10, 2026

Comprehensive Action Plan Formulated to Prevent Flooding with Pre-Monsoon and Monsoon Preparedness – D.S. Ramesh

With the objective of effectively managing potential flooding, waterlogging, and infrastructure-related issues during the upcoming pre-monsoon and monsoon seasons, a progress review meeting was convened under the chairmanship of Commissioner D.S. Ramesh of the Bengaluru East City Corporation. Officials from various departments participated in the meeting and held detailed discussions on pre-monsoon preparedness, disaster management, inter-departmental coordination, and implementation of emergency response measures.

Key Points Discussed in the Meeting

Formation of Disaster Management Coordination Team

To address emergencies during the monsoon season:

• Instructions were issued to form Disaster Management Coordination Teams comprising officials from the City Corporation, BWSSB, BESCOM, Traffic Police, Fire Department, Forest Department, and SDRF personnel.

• Directions were given to activate 24×7 control rooms in all divisions for continuous monitoring.

• Preparation of SDRF/NDRF personnel lists was instructed to ensure prompt emergency response.

*Instructions for Immediate Action in Flood-Prone Areas*

Officials were directed to take action before April 15 in major flood-prone areas including:

• Sarjapur Main Road (near Columbia Asia Hospital)

• Geddalahalli, SAIL Layout, Vaddarapalya (Railway track area)

• Pai Layout, Munnekollalu, Doddanekkundi, Bellathur

• Panathur Railway Bridge, Shivagangana Layout

• Challaghatta, Yemalur, Kadugodi, Channasandra Main Road

Key actions include:

• Removal of silt, debris, plastic waste, solid waste, and construction debris from rajakaluves and drains

• Ensuring free flow of stormwater

• Improving drainage connectivity in low-lying areas

Rajakaluve Development, Encroachment Clearance & Technical Measures

• Removal of encroachments along rajakaluves in areas such as Munnekollalu, Doddanekkundi, Fern City, Challaghatta, and Yemalur

• Preparation of alignment for undeveloped stormwater drains based on revenue maps

• Acceleration of stormwater drain development works under World Bank-funded projects

Special Technical Measures:

• Installation of non-return valves in Pai Layout

• Deployment of automatic pumping systems in Munnekollalu

• Installation of water level indicators at underpasses

Drainage and Road Infrastructure Maintenance

• Completion of desilting works in primary, secondary, and tertiary drains

• Cleaning of roadside drains and gratings

• Completion of stormwater connectivity works under CMIDP and SSIP schemes by end of April

• Completion of pipe drains and silt chambers in white-topping roads

Responsibilities of BWSSB and BESCOM

BWSSB:

• Pre-cleaning of sewer lines prone to overflow during rains

• Replacement of damaged manhole covers

• Measures to reduce sewer pressure during heavy rainfall

BESCOM & Forest Department:

• Removal of dry and hazardous tree branches

• Preventive measures to avoid power disruptions

• Prompt response to public complaints

*Lake Management and Water Flow Measures*

• Ensuring cleanliness at lake inlets and outlets for smooth water flow

• Preventing sewage inflow into lakes by creating diversion drains

• Strict action against unauthorized constructions in the Saul Kere buffer zone

Traffic Management and Public Safety

• Identification of waterlogging-prone roads in coordination with traffic police

• Installation of water level indicators in underpasses

• Coordination for traffic regulation during heavy rainfall

Emergency Equipment Readiness

Officials were instructed to keep the following equipment ready:

• De-watering pumps

• Jetting and suction machines

• JCBs, tippers, tractors

• Safety equipment

• Torches and electric cutters

Appeal to the Public

The Bengaluru East City Corporation is implementing a comprehensive, multi-departmental, and time-bound action plan to prevent flooding during the monsoon season.

The Commissioner appealed to the public to:

• Avoid dumping waste into drains and rajakaluves

• Refrain from encroaching lakes and stormwater drains

• Contact the Corporation helpline during emergencies

• Cooperate in maintaining cleanliness and public safety

The meeting was attended by:

• Additional Commissioner (Development) Lokhande Snehal Sudhakar

• Chief Engineers M. Lokesh and Krishnamurthy

• Jayashankar (BWSSB)

• Officials from BWSSB, BESCOM, Traffic Police, Forest Department, Railways, and Disaster Management units


Spread the love