Bengaluru, November 05, 2026
Inspection of development works near J.P. Nagar 4th Phase Metro Station by Commissioner K. N. Ramesh
Sri K. N. Ramesh, Commissioner of Bengaluru South City Corporation, visited and conducted an on-site inspection today of the surrounding roads, footpaths, and the Stormwater Drain (SWD) area passing in front of Vaishnavi Apartments near the J.P. Nagar 4th Phase Metro Station under the jurisdiction of Bengaluru South City Corporation.
Directions for smooth traffic movement and parking facilities near Metro Station
In connection with implementing the directives previously issued by Greater Bengaluru Minister Sri Krishna Byre Gowda during his site inspection, the Commissioner instructed officials to further widen and properly maintain the footpath for the convenience of commuters exiting the J.P. Nagar 4th Phase Metro Station. To ensure that vehicular movement on the main road is not disrupted, the Commissioner directed BMRCL and Corporation officials to install a median toward the service road and designate specific areas for the systematic parking of two-wheelers and four-wheelers.
Remove steps on the Rajakaluve bridge
Noting that unauthorized individuals have constructed steps on the Rajakaluve bridge along the road adjacent to the Royal Oak showroom on Bannerghatta Road—causing obstruction to vehicular traffic—he directed officials to remove them immediately and build a ramp to facilitate vehicular movement. Furthermore, he issued instructions to clear the construction debris dumped in the open area in front of the Katte Muneshwara Swamy Temple.
Instruction to conduct a survey of the original Rajakaluve alignment
Inspecting the Rajakaluve in front of Vaishnavi Apartments and Kalyani Magnum, the Commissioner examined issues arising from covering the drain with slabs and creating artificial diversions along the path carrying water from Sarakki Lake toward Madiwala Lake. He instructed officials to conduct a survey of the actual natural course (original drain) of the Rajakaluve in accordance with Revenue Department records.
Strict action to clear encroachments/obstructions and desilt
Taking serious note of the foul odor caused by stagnant sewage water due to construction debris and solid waste trapped inside the Rajakaluve, the Commissioner directed that desilting works be undertaken immediately behind Rainbow Hospital and along the compound wall area. He instructed officials to remove unauthorized slabs and obstructions over the Rajakaluve and establish a permanent solution for the smooth flow of water to prevent any flooding situation during the monsoon season.
Chief Engineers Sri Basavaraj Kabade, Malathi, Executive Engineers Ravi, Hariprasad, and other officials were present on this occasion


More Stories
From Engineering to Khaki: R. Hithendra’s Three-Decade Journey in Police Service
Permanent Solutions to Bengaluru’s Civic Issues Are Government’s Aim: CM
Bengaluru West Corporation to Prepare Solid Waste Management Micro-Plans for All Wards