Bengaluru Express
Bengaluru, Oct 30:
The Bengaluru Central City Corporation has set a 15-day deadline to eliminate all garbage black spots, directed officials to repair road potholes by the end of November and ordered the removal of footpath encroachments as part of the ‘Ward One’ campaign to develop model wards across the city. These directions were issued by Corporation Commissioner Jagadish G.
The campaign aims to provide clean surroundings, safe roads, smooth traffic movement and better civic facilities. Key areas include sanitation, road and drain repairs, streetlight maintenance, drinking water supply, underground drainage, parks, lakes, waste management, public transport and traffic management.
During a review meeting held on October 29, following directions from GBA Minister Krishna Byre Gowda, the Commissioner instructed various departments and agencies to work in coordination to implement the campaign and develop the identified wards in each Assembly constituency as model wards.
Black Spots to Be Cleared Within 15 Days
Jagadish directed officials to clear all garbage black spots within the corporation limits within 15 days. Every black spot must be cleared by 6 a.m. daily, with continuous monitoring to prevent waste from accumulating again. Door-to-door garbage collection must also be strengthened through effective coordination between officials and marshals.
Fines for Public Waste Dumping
Officials were instructed to impose fines on those dumping waste in public places and creating black spots. Every shop must have a dustbin, and shop owners will be held accountable if garbage is found in front of their establishments.
Strict Action Against Banned Plastics
The Commissioner directed officials to create public awareness about the harmful effects of single-use plastics. Banned plastic products found in shops must be confiscated, and penalties imposed as per rules.
Footpath and Road Improvements
Officials were asked to inspect footpaths along arterial and sub-arterial roads, remove encroachments and repair damaged stretches to ensure pedestrian safety. Major junctions must also be developed, while all road potholes must be repaired scientifically by the end of November, maintaining quality standards.
Focus on Transparency and Quality
Emphasising accountability, Jagadish instructed officials to utilise public tax revenue transparently, avoid unnecessary expenditure and prioritise durable, quality development works. Regular monitoring of project progress and workmanship was also stressed.
Additional Commissioners Venkatachalapathi R. and Lakshmamma, Joint Commissioner Ranganath K., Chief Engineer Vijay Kumar Haridas, engineers, AGM and DGM officials, marshal supervisors and other staff attended the meeting.
All 5 commissioners of different city corporations held separate meetings in this regard and directed to make the ambitious ward one initiative a grand success.

More Stories
From Engineering to Khaki: R. Hithendra’s Three-Decade Journey in Police Service
Permanent Solutions to Bengaluru’s Civic Issues Are Government’s Aim: CM
Bengaluru West Corporation to Prepare Solid Waste Management Micro-Plans for All Wards